Search results for query: *

  1. C

    Flaming River U-joint Coupler Issues

    Hi, I'm trying to install Flaming River u-joints in place of the 'biscuit' and lower slip joint. The top is 3/4" x 36 spline and the lower is 5/8" 36 spline Top fits fine, but I'll be damned if the lower ujoint will slip onto the splines, I've confirmed it is 36 splines and measured with my...
  2. C

    Holley 670 Vacuum Secondary Issue ~ Opening late/not at all

    Any ideas here will be greatly appreciated, I have a Holley 670 cfm 4150 with vacuum secondaries. Trouble is the secondaries hardly open and when they do it is at higher rpms when I'm pretty much topped out. The air passage is free, the diaphram is good and I've resorted changed the spring to...
Back
Top