sprice
Active Member
I am upgrading my 68’ 300 to tilt column with cruise. I’m just wanting to confirm how to install the cc lever. It appears I should turn the lever in first, then feed the wires through, however I am concerned about bending the wires at the base of the lever to the point of breaking the insulation or slicing. Is there a technique I am missing?